Skip to product information
1 of 2

CreativeSafetySupply

Project Planning Portrait Whiteboard (48" x 36"

Project Planning Portrait Whiteboard (48" x 36"

Regular price $558.40 USD
Regular price $558.40 USD Sale price
Shipping calculated at checkout.

About This

  • MAGNETIC DRY-ERASE SURFACE — Designs are directly printed onto a durable vinyl layer that is resistant to stains and ghosting, ensuring long-lasting visibility and a smooth writing surface. The surface is also magnetic, giving you freedom to accessorize your whiteboard however you like or attach any number of documents
  • EASY INSTALLATION — Includes mounting brackets and hardware for secure and hassle-free wall mounting. For a quick tutorial on how to properly install your whiteboard, please watch our video located in this product page
  • SPACIOUS WRITING AREA – Large enough to capture a wide range of information without running out of space, encouraging collaboration and communication between departments. Writing area measures 2" less than the board's total dimensions
  • DURABLE ALUMINUM FRAME – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
  • Please inspect your whiteboard upon arrival – If you notice any issues, please contact us through Amazon's Buyer-Seller Messaging system

Overview

  • Brand : Creative Safety Supply
  • Color : White
  • Material : Aluminum, Vinyl
  • Recommended Uses For Product : Office
  • Mounting Type : Wall Mount
View full details