Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
1
/
of
3
Handy+Forms
A5 Size Project Planner, Sized and Punched for 6-Ring A5 Notebooks by Filofax, LV (GM), Kikki K, TMI, and Others. Sheet Size 5.83" x 8.27" (148mm x 210mm)
A5 Size Project Planner, Sized and Punched for 6-Ring A5 Notebooks by Filofax, LV (GM), Kikki K, TMI, and Others. Sheet Size 5.83" x 8.27" (148mm x 210mm)
Regular price
$13.10 USD
Regular price
$13.10 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
About This
- PLANNER PAGE SIZES FOR 6-RING NOTEBOOKS CAN BE CONFUSING. PLEASE CHECK THE IMAGES FOR A PLANNER PAGE SIZE COMPARISON TO BE SURE THIS PRODUCT WILL FIT YOUR NOTEBOOK.
- Project planner and manager for A5 Size notebooks.
- Simplifies project documentation of planning steps, tasks/actions, and milestones.
- Punched with 2 groups of 3 holes spaced 3/4" (19mm) with 2-3/4" (70mm) between the groups to fit the popular 6-ring A5 size notebooks by Filofax, LV (GM), Kikki K, TMI, Quo Vadis, and others.
- Page size is 5.83" x 8.27" (148mm x 210mm). Printed on exceptionally high quality heavy weight paper (120 gsm), with a silky-smooth writing surface. Does not bleed through. 50 sheets per pack.
Overview
- Brand : Handy Forms
- Color : Rose Madder
- Cover Material : Paper
- Year : 2020
- Format : Organizer
- Target Audience : Adult
- Sheet Size : A5
- Material : Paper
- Binding : Unknown Binding
- Product Dimensions : 5.83"L x 8.27"W
Share
